9 services
Claims & Dispute Resolution ServicesClaim preparation, defence and delay analysis for contractors, employers and legal teams.
6 services
Commercial & Contract AdvisoryContract, procurement and cost advice that protects your commercial position.
6 services
Expert Witness & Forensic ServicesIndependent expert evidence and forensic investigation for arbitration, litigation and adjudication.
7 services
Project Controls & SchedulingPrimavera P6 planning, progress control and schedule risk work that keeps projects on programme.
5 services
Technical & Engineering ConsultancyEngineering review, BIM and technical audits by experienced engineers.
4 services
Tendering ServicesBid strategy, tender documents and evaluation support for contractors and employers.
9 services
Claims & Dispute Resolution ServicesClaim preparation, defence and delay analysis for contractors, employers and legal teams.
6 services
Commercial & Contract AdvisoryContract, procurement and cost advice that protects your commercial position.
6 services
Expert Witness & Forensic ServicesIndependent expert evidence and forensic investigation for arbitration, litigation and adjudication.
7 services
Project Controls & SchedulingPrimavera P6 planning, progress control and schedule risk work that keeps projects on programme.
5 services
Technical & Engineering ConsultancyEngineering review, BIM and technical audits by experienced engineers.
4 services
Tendering ServicesBid strategy, tender documents and evaluation support for contractors and employers.
Book a Zoom call with a Solvix consultant at a time that suits you. The Zoom link is sent to you as soon as you book.
Book a Zoom call with a Solvix consultant at a time that suits you. The Zoom link is sent to you as soon as you book.

Solvix International provides Earned Value Management (EVM) services for clients that need a clearer, more measurable view of project performance. We integrate baseline scope, time-phased budget, progress measurement, and actual cost data to show whether the project is delivering value at the rate originally planned and what that means for likely final outcomes.

Our EVM service can be used as a full implementation, a health check of an existing reporting system, or a targeted support engagement where cost and schedule data need stronger analytical discipline.
EVM can be applied as a full implementation on a new project, as a health check of an existing reporting system, or as a targeted review of performance on a troubled package.

EVM reporting is only useful if the baseline, progress measurement, and cost data are aligned. Many systems produce indices that look precise but are built on inconsistent inputs. We check the inputs before interpreting the results.

Traditional schedule updates and cost reports can show that a project is late or overspent, but they do not always explain whether the value of completed work is keeping pace with plan. EVM addresses that gap by connecting scope, time, and cost in one measurement framework. It helps leadership understand not just what has been spent, but what has actually been achieved for that spend and what the trajectory suggests for completion.
The indicators that turn baseline data and actual performance into decision-ready project intelligence
Budgeted value of work scheduled to be completed by a reporting date.
Budgeted value of the work actually performed based on measured progress.
Real cost incurred for the work completed during the reporting period.
EV ÷ AC. Measures cost efficiency and overspend or underspend trend.
EV ÷ PV. Measures how efficiently the project is progressing against plan.
Estimate final cost, remaining cost, and expected variance at completion.
The exact method depends on contract form, data maturity, project phase, and reporting audience. However, the core implementation logic remains consistent: create a reliable baseline, define how value is earned, capture actual performance accurately, and then issue metrics and forecasts that management can trust.
assess WBS logic, cost-code mapping, budget loading, reporting calendar, and control-account structure.
define how each work package earns value, including quantities, milestones, weighted steps, or physical progress rules.
align committed cost, actual cost, accruals, and cost timing so the reporting period reflects the real expenditure position.
update EV, PV, AC, variances, indices, and forecast fields, while checking for distortion or data inconsistency.
translate the metrics into management insight, root-cause review, and recommended corrective actions.
Strong EVM depends on disciplined source data and a reporting structure that decision-makers can actually use. Solvix works with the client’s live controls environment, identifies data gaps, and develops outputs that are practical for management, governance, lenders, delivery partners, and, where relevant, dispute-sensitive review.
EVM is a performance-management method that compares planned value, earned value, and actual cost to measure cost efficiency, schedule efficiency, and likely final outcomes.
No. It is especially valuable on major projects and programmes, but the principles can be scaled to suit medium-sized projects if the baseline and reporting structure are disciplined.
Yes. Solvix can build EVM around existing Primavera P6, MS Project, ERP, cost-reporting, and dashboard workflows, rather than forcing an entirely separate reporting environment.
At Solvix International, we specialize in delivering exceptional project management and consultancy services.
Loop in for the latest news and insights from Solvix International.
Local Expertise. Global Standards.
Our Dubai team combines deep local knowledge with international best practices to deliver exceptional results for every project.