Project Controls & SchedulingPrimavera P6 planning, progress control and schedule risk work that keeps projects on programme.
Services
Technical & Engineering ConsultancyEngineering review, BIM and technical audits by experienced engineers.
Services
Tendering ServicesBid strategy, tender documents and evaluation support for contractors and employers.
Services
Claims & Dispute Resolution ServicesClaim preparation, defence and delay analysis for contractors, employers and legal teams.
Services
Commercial & Contract AdvisoryContract, procurement and cost advice that protects your commercial position.
Services
Expert Witness & Forensic ServicesIndependent expert evidence and forensic investigation for arbitration, litigation and adjudication.
Services
Project Controls & SchedulingPrimavera P6 planning, progress control and schedule risk work that keeps projects on programme.
Services
Technical & Engineering ConsultancyEngineering review, BIM and technical audits by experienced engineers.
Services
Tendering ServicesBid strategy, tender documents and evaluation support for contractors and employers.
Certified planners build, update and review your Primavera P6 schedules. You receive the native .XER file, a PDF layout and a written narrative, checked against the DCMA 14-point assessment before issue.
In a free 30-minute call we discuss the project, the contract programme requirements and your deadline, and confirm the scope and fee in writing.

A programme the engineer accepts and the site team can use. We prepare and maintain Primavera P6 schedules for contractors, developers, project managers and owners on buildings, infrastructure, energy and industrial projects.
Solvix International provides Primavera P6 scheduling services across the full project life: the baseline programme, monthly updates and progress reports, recovery and revised schedules, and independent schedule reviews. Our planners work in your P6 EPPM database or exchange .XER files with your team, and follow the contract’s programme clauses (FIDIC, NEC, JCT, AIA and government forms) and the owner’s scheduling specification.
Every schedule is built with logic-driven sequencing, realistic durations, clear calendars and coding, and limited constraints, so the critical path is real and the programme can later support extension of time or delay analysis if it is needed.

You receive the .XER file with layouts, codes, calendars and baselines set up, plus a PDF Gantt chart and a narrative. We can also work directly in your P6 EPPM database.
Each schedule is tested against the DCMA 14-point assessment and the contract’s programme requirements, so comments from the engineer or owner are kept to a minimum.


PMI-SP and PSP certified planners with more than ten years of P6 work for contractors, owners and consultants.
Schedules are built and updated so they can support EOT, delay and disruption analysis if a dispute arises.
Each issue comes with a narrative in plain language: what changed, why, and what it means for the completion date.
We prepare baseline programmes, monthly updates and progress reports, recovery and revised schedules, independent schedule reviews and DCMA 14-point health checks, resource and cost loading, time impact analysis fragnets, and conversions between P6 and Microsoft Project. We also set up P6 databases and train project teams.
Either. We can work in your P6 EPPM database with a user account you provide, or exchange .XER files with your planners. You always receive the native file, a PDF layout and a written narrative.
A typical building baseline takes one to two weeks once we have the contract programme requirements, drawings, method statements and procurement dates. Large infrastructure or multi-package projects take longer, and we confirm the timetable before we start.
We record progress and actual dates from site data, update remaining durations, move the data date and reschedule. The report compares the update with the baseline and the previous month and sets out the critical path, float changes, delayed activities and any events that may need a delay notice.
Yes. We offer a free P6 schedule health check based on the DCMA 14-point assessment, with the findings sent within two working days. If the schedule needs work, we quote for the corrections separately.
Yes. We build and update schedules in Microsoft Project and Asta Powerproject, and convert schedules between P6 and Microsoft Project when the employer and contractor use different software.
Yes. We keep the accepted baseline and each monthly update as separate records, flag delay events as they happen, and add fragnets for time impact analysis. This gives you the contemporaneous programme evidence an EOT claim needs.
Our planners hold PMI-SP and PSP certifications and have prepared and reviewed P6 schedules on projects in the GCC, the UK, Ireland and the US, including government, power, residential and infrastructure work.
Each service can be taken on its own or as part of a monthly scheduling support arrangement.
A fixed scope and fee agreed in writing before work starts.
Local pages for clients in our main markets.
At Solvix International, we specialize in delivering exceptional project management and consultancy services.
Loop in for the latest news and insights from Solvix International.

Phone: +20 1095 256 661
Address: 23 Zahra Al Maadi, Cairo, Egypt
Local Expertise. Global Standards.
Our Dubai team combines deep local knowledge with international best practices to deliver exceptional results for every project.
We use essential cookies to run this site. With your permission we also use Google Analytics cookies to see which pages are useful and which lead to enquiries. Cookie Policy